==========
20190102:

1. Shutdown All-Hands meeting.

2. Worked on upgrading CLM4 to CLM4.5. See notes in /discover/nobackup/fzeng/clm4-to-clm4.5/notes/notes_daily_2019.

3. Discussed with Zhen (via email) about the difference between the meteorology forcing used in Catchment-CN and that used in their LPJ model. 

==========
20190103:

1. Worked on upgrading CLM4 to CLM4.5. See notes in /discover/nobackup/fzeng/clm4-to-clm4.5/notes/notes_daily_2019.

2. Read Eunjee's poster and presentation slides for the AMS and provided comments. 

==========
20190104:

1. Worked on upgrading CLM4 to CLM4.5. See notes in /discover/nobackup/fzeng/clm4-to-clm4.5/notes/notes_daily_2019.

==========
20190107:

1. Worked on upgrading CLM4 to CLM4.5. See notes in /discover/nobackup/fzeng/clm4-to-clm4.5/notes/notes_daily_2019.

==========
20190108:

1. Worked on upgrading CLM4 to CLM4.5. See notes in /discover/nobackup/fzeng/clm4-to-clm4.5/notes/notes_daily_2019.

2. Worked with Sarith on the FPAR paper. Discussed with Sarith about what sections we need to write and who is reponsible for what sections. Read CLM4 Tech Note and the Catchment-CN code on how FPAR is calculated. Wrote a paragraph about this in the draft.  

==========
20190109:

1. Worked on Sarith's JAMES FPAR manuscript: wrote about 2 pages on how APAR is calculated in Catchment-CN (same as CLM4).

==========
20190110:

1. Worked on upgrading CLM4 to CLM4.5. See notes in /discover/nobackup/fzeng/clm4-to-clm4.5/notes/notes_daily_2019. 

==========
20190111:

1. SSAI's shutdown all-hands meeting.

2. Worked on Sarith's prescribed LAI manuscript.

3. Continued reading papers about CLM4.5 development in order to find a way to improve GPP in Catchment-CN with CLM4.5.

4. Travel request.

5. Worked on upgrading CLM4 to CLM4.5. See notes in /discover/nobackup/fzeng/clm4-to-clm4.5/notes/notes_daily_2019.

==========
20190114:

1. Reviewed and responded to emails.

2. Wrote the first draft of the abstract for the winter Land Model (LMWG) and Biogeochemistry (BGCWG) joint working group meetings.

3. Worked on upgrading CLM4 to CLM4.5. See notes in /discover/nobackup/fzeng/clm4-to-clm4.5/notes/notes_daily_2019.

==========
20190115:

1. Worked with Sarith on processing Jan GMAO forecast.

2. Worked on upgrading CLM4 to CLM4.5. See notes in /discover/nobackup/fzeng/clm4-to-clm4.5/notes/notes_daily_2019.

3. Answered questions from a collaborator in Code 618 on the meteorology data used in model spinup. 

==========
20190116:

1. Worked on upgrading CLM4 to CLM4.5. See notes in /discover/nobackup/fzeng/clm4-to-clm4.5/notes/notes_daily_2019.

2. Worked on the abstract and slides for the LMWG-BGCWG meetings.

==========
20190117:

1. SSAI brunch.

2. Meeting at SSAI about concerns or work related issues related to the shutdown.

3. Contacted GMAO System Administrator back and forth to resolve the file transfer issue between the supercomputer (Discover) and my laptop. 

4. Further modified the abstract and sent the final version to the secretary for DAAs and to the coauthors.

5. Contacted GMAO System Administrator about opening an account for me on GMAO's ftp. 

6. Discussed with a collaborator in Code 614 about our fire burned area and carbon emissions. 

==========
20190118:

1. Attended SSAI's All-Hands meeting to learn the situation of the shutdown. 

2. Searched for and read other papers about CLM4.5 development. Read other sections about photosynthesis calculations in CLM4.5 Tech Note. Found that our canopy air vapor pressure calculation is slightly different from the original CLM4.5. Does this affect GPP? If so, how?

3. Updated my PEP goals on ADP Workforce.

4. Contacted LMWG-BGCWG meeting organizers for suggestions on hotel and contacted the hotel about room reservation. 
Reserved a room, confirmation number is 84309364. Can cancel for free until 2 days before arrival day. Check in: Feb 10, check out: Feb 13
Reservation email was sent to my NASA email, but have not received it so far. 

==========
20190122:

1. Communicated with the program manager Robin about the charge code of my task on biomass burning which has become obsolete. 

2. Called Nardy Tello at Cl Azumano Travel about hotel reservation. She said we don't need to book hotel through them. I still haven't received the hotel confirmation email. Called the hotel and found that the room booked is in North Caroline instead of Boulder CO. Made the correction, but the room in Boulder is $174/day, much higher than the lodging per diem rate $131 for Boulder. Contacted Robin about this and also ask if I can register even if it's not refundable. Emailed Dave Lawrence and he said registration is refundable. Registered. 

3. Worked on upgrading CLM4 to CLM4.5. See notes in /discover/nobackup/fzeng/clm4-to-clm4.5/notes/notes_daily_2019. 
  
==========
20190123:

1. Contacted the PI about the charge code of my task on biomass burning.

2. Worked on upgrading CLM4 to CLM4.5. See notes in /discover/nobackup/fzeng/clm4-to-clm4.5/notes/notes_daily_2019.

3. Worked on the slides for the LMWM-BGCWM meeting. 

Comparing the code in CN_init and CLM4 Tech Note p211, I found that the fcur values we are using are consistent with the CLM4 Tech Note.

==========
20190124:

1. Worked on upgrading CLM4 to CLM4.5. See notes in /discover/nobackup/fzeng/clm4-to-clm4.5/notes/notes_daily_2019. 

2. Worked on the slides for the LMWM-BGCWM meeting.

==========
20190125:

1. Worked on upgrading CLM4 to CLM4.5. See notes in /discover/nobackup/fzeng/clm4-to-clm4.5/notes/notes_daily_2019. 

2. Worked on the slides for the LMWM-BGCWM meeting.

3. Discussed with Sarith on model result analyses for the FPAR paper. 

==========
20190128:

1. Archived my NASA emails to release some space in the mailbox.

2. Worked on the slides for the LMWM-BGCWM meeting.

3. Met with Randy and Eunjee to talk about slides for the LMWM-BGCWM meeting.

4. Emailed Dave about the possibility of joining the meeting and giving the presentation remotely. 

==========
20190129:

1. Emailed Randy and Eunjee about the initial conditions for CLM4 and CLM4.5 simulations

2. Talked to Randy and Eunjee about Eunjee's suggestions

3. Emailed Melanie about remaking the CLM4 fire carbon loss map using the same color scale as GFED4 and CLM4.5

4. Replied to Joe about his questions on my PEP goals

5. Emailed Abhishek about the updated Catchment-CN SMAP run

==========
20190130:

1. Did more analyses on respiration and site-level comparisons for the LMWM-BGCWM meeting slides.

==========
20190131:

1. Did more analyses on respiration and site-level comparisons for the LMWM-BGCWM meeting slides.

2. Met with Randy and Eunjee to talk about slides for the LMWM-BGCWM meeting.

3. Replied to Ben Paulter's emails about precipitation data used in our spinup. 

